| Sector - Waldorf Hotel |
| |
| Sector:
|
Hotels
|
| Project name:
|
Waldorf Hotel
|
| Location:
|
London WC2
|
| Client:
|
Le Meridien Hotel Group
|
| Architect:
|
RPW Design
|
| Quantity Surveyor:
|
Gardiner & Theobald
|
| Principle Contractor:
|
Peppiatt Contracts Ltd
|
| Duration:
|
48 weeks
|
| Completion Date:
|
04/01/2004
|
| Value:
|
£720,000
|
| Related study:
|
Composite Stone
Fabrication
|
| |
| Phased refurbishment of 360nr rooms to either a modern or traditional feel whilst the hotel remained opened and undisturbed. A 300x300 marble composite tile was used throughout with bespoke shower and door thresholds, mother of pearl vanity tops and skirting pieces. Other works included cleaning existing marble works/items, new marble vanity tops, removal and replacement of individual wall tiles (including salvage) and revitalising the existing wall grouting (5100m2) |
|
|
| Contact us |
Stone & Ceramic
Ltd
3, Kingside, Ruston Road,
Woolwich
London
SE18 5BX
Tel. 020 8855 5400
Fax. 020 8855 5404
info@stone-ceramic.co.uk |
|